Friday, November 13, 2009

 

Build Day 4

Installed the harmonic balancer, the crank pulley, the water pump housing, the water pump, the thermostat and thermostat housing, a wire loom holder, the temp sensor (not pictured), the heater hose barbs (not pictured), the water pump pulley (temporary install), and the head studs (not pictured).

DSCF0068

Comments: Post a Comment

<< Home

This page is powered by Blogger. Isn't yours?